CLOSE

Specials

  • Underground Construction Solutions
  • Startups APAC
  • Construction Forensic Services
  • Flooring System
  • Waterproofing APAC
  • Wall Systems
  • Safety and Compliance Europe
  • Roofing Systems
  • Construction Executive Search
  • Construction Engineering
  • Bridge Construction
  • Architectural Glass APAC
  • Roofing Systems Europe
  • Safety and Compliance APAC
  • Civil Engineering
  • Air Quality
  • Commercial Concrete
  • Cladding Systems
  • Construction Equipment
  • Mechanical Electrical and Plumbing
  • Marine Construction
  • Steel Building
  • Project Management Europe
  • Construction Demolition
  • MODULAR CONSTRUCTION
  • Safety and Compliance
  • HVAC
  • Others
  • Construction and Bid Estimation
  • Green Building Solutions
  • Interior Design
  • Dry Construction
  • Roofing Tech
  • Construction Demolition and Recycling
  • Building Information Modeling
  • Steel Building Apac
  • Construction Tech
  • Elevators and Escalators
  • Architectural Glass
  • Construction Middle East Special 2021
  • Europe
  • APAC
  • Roofing System APAC
  • Construction Demolition and Recycling Europe
  • Plumbing System
  • Door Systems
  • Flooring Tech

I agree We use cookies on this website to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. More info

Skip to: Curated Story Group 1
constructionbusinessreview
US
EUROPE
APAC
  • Home
  • Contributors
  • News
  • Conferences
  • Newsletter
  • Magazine
  • About

Thank you for Subscribing to Construction Business Review Weekly Brief

×
#

Construction Business Review Weekly Brief

Be first to read the latest tech news, Industry Leader's Insights, and CIO interviews of medium and large enterprises exclusively from Construction Business Review

Subscribe

loading
  • Home
  • Contributers

Recommended Insights

Seizing Digital Opportunities to Increase...

Eric Wilson, Vice President, Turner and...

Utilizing Technology to Achieve Project...

Mike Sidani, Director of Project Delivery...

Innovation Opportunities in Construction

Jake Pepper, Vice President of Integrated...

AI has Potential but is Not Yet a Reality...

Matthew Ohlman, CTO, Shadow Ventures

3D Printing Reforming Construction Industry

Ron Klyn, CIO, Universal Forest Products

6 Technology Adaptation Lessons in...

Jeff Cann, CIO & Chief Strategist, Encore...

Marketing - How Do You Measure Up?

Jason Myers, VP of Demand Development, The...

Creating the Right Environment for Innovation

Chris Zeppa, CIO, Walker Engineering

Seizing Digital Opportunities to Increase...

Eric Wilson, Vice President, Turner and...

Utilizing Technology to Achieve Project...

Mike Sidani, Director of Project Delivery...

Innovation Opportunities in Construction

Jake Pepper, Vice President of Integrated...

AI has Potential but is Not Yet a Reality...

Matthew Ohlman, CTO, Shadow Ventures

3D Printing Reforming Construction Industry

Ron Klyn, CIO, Universal Forest Products

6 Technology Adaptation Lessons in...

Jeff Cann, CIO & Chief Strategist, Encore...

Marketing - How Do You Measure Up?

Jason Myers, VP of Demand Development, The...

Creating the Right Environment for Innovation

Chris Zeppa, CIO, Walker Engineering

Accelerated Bridge Construction Techniques Using Prefabricated and Pre-Assembled Structural Systems

Sevak Demirdjian, Vice President
Tweet

ABC Techniques have been used by SNC-Lavalin engineers throughout the years to ensure world-class bridge construction.


Rationale for Implementing ABC Techniques for a Sustainable Bridge Construction


ABC Techniques have been used by SNC-Lavalin engineers throughout the years to ensure world-class bridge construction. Accelerated techniques for bridge construction should be used where the benefits have effects on the construction costs. This modern technology was used to implement innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce on-site construction. Decisions to use accelerated bridge construction techniques are made after considering the specific factors, mainly temporary roadways, temporary retaining structures, environmental impacts, sustainable development, user costs, social and financial prerogatives, long detours, and means and methods. The author has selected in this article, several structures where innovation and sustainability are paramount. Two major project applications are presented. The first consists of a new construction for two projects: an elevated roundabout and the new Champlain Bridge. The second describes the reconstruction of a footbridge and the replacement of bridge decks through different structural techniques.


Construction of an Elevated Roundabout


This is a complex geometry project located in a highly urbanized area. The project includes the relocation of public utilities, demolition of existing structures, construction of new structures and new roadways, and preparation of temporary roads and alternate itineraries for highway traffic, public transport, and pedestrian traffic. The elevated structure was constructed over a major highway in phases to maintain traffic flow.


Construction of a Footbridge


The construction entails the replacement of an existing footbridge. The ABC technique was implemented, which comprises HPC precast pre-stressed elements offering the most economical solution. The bridge spans 35m. The cross-section consists of two Z-shaped pre-cast girders with the shape providing a bottom ledge for supporting the pre-cast panels for the deck slab.


Reconstruction of the Jacqus-Cartier Bridge Deck Replacement–Integral Deck Floating System


Measuring 2.70 km span crossing a major river, with five lanes of traffic, this bridge carries more than 43 million vehicles every year, making it one of the busiest bridges in North America on a per lane basis. The ABC Technique for deck replacement was developed based on the following main objectives:


• Minimize inconveniences to as many users as possible


• Construct a highly durable deck (design service life greater than 50 years)


• Minimize negative impacts on the environment


Reconstruction Of Princess Margaret Bridge–Intergral Deck, Composite Action The Princess Margaret Bridge provides an elevated crossing over a major river, measuring 1097 m in overall length. It is a high-level structure supported on tall, slender piers to provide the required 23± m clearance for the center navigation span. The roadway is supported by nine deck truss spans, one through-truss navigation span, seven Plate Girder spans, and six Rolled Beam approach spans.


A composite section was created between the deck slab and the steel members. This composite action tremendously improved the capacity of those members and therefore reduced the need for strengthening.


Composite actions were created between the deck panels and top chord steel truss. The composite actions to the steel members were achieved through a spine beam that was detailed to connect either the Plate Girder top flange or the Deck Truss top chord to the deck panels after the post-tensioning operations.


New Champlain Bridge Corridor Crossing The St-Lawrence River


On October 5, 2011, the Government of Canada announced the replacement of the Champlain Bridge, one of the busiest crossings in Canada, carrying between 40 and 50 million vehicles per year.


The asymmetric, cable-stayed bridge features a 155-meter-high concrete tower and stay cables in a harp arrangement, an aesthetic element that designers felt would bolster the bridge’s place amongst the architecture of the cityscape. The three-corridor design of the project includes two three-lane roadways, a multi-use path for pedestrians and cyclists, as well as a two-lane transit artery that will accommodate a light-rail system. The overall construction timeline was a tight 42 months, which made for an accelerated schedule. Consequently, pre-cast elements played a major role in project planning and execution. Offsite pre-fabrication took some pressure off the on-site construction teams so that crews could focus more directly on other construction components. Heavy gravity-based footing and pier starters for in-water approach spans with units weighing 800 to 900 metric tons were pre-fabricated on-site at a temporary pre-casting plant installed on an adjacent jetty. The units were then delivered to their final location using a custom-built gantry mounted on a large catamaran barge. The accelerated construction strategy was key to meeting the delivery schedule.


Conclusion


Accelerated techniques for bridge construction should be used where the benefits have effects on the construction costs. This modern technology was used to implement innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce on-site construction. Decisions to use accelerated bridge construction techniques were made after considering the specific factors, mainly temporary roadways, temporary retaining structures, environmental impacts, sustainable development, user costs, social and financial prerogatives. In this article, the author has selected several bridge structures where the Accelerated Bridge Construction techniques were applied.


Weekly Brief

loading
Top 10 Underground Construction Service Companies to Watch in - 2021
> <
  • Underground Construction Solutions 2021

    Top Vendors

    Current Issue
  • Underground Construction Solutions 2020

    Top Vendors

    Current Issue

Read Also

Projects Today Come Down To Nerves Of Steel And Realistic Expectations

Jason D’Orlando, Senior Managing Director, Life Sciences Project & Development Services Michael Morehead, Senior Director, Industrial Project & Development Services
 Projects Today Come Down To Nerves Of Steel And Realistic Expectations

Key Challenges in Managing Construction and Demolition Waste

Jonathan Shamrock, Technical Director, Tonkin & Taylor Ltd
Key Challenges in Managing Construction and Demolition Waste

Technology, Purpose and the Office

Angela Spathonis, Principal & Managing Director, Gensler Singapore
Technology, Purpose and the Office

Collaborative Approaches, Innovation, and Technology

Richard Kimber, Managing Director, DPR Construction
Collaborative Approaches, Innovation, and Technology
 Applying OSHA Code in the home services and contracting ecosystem

Applying OSHA Code in the home services and contracting ecosystem

Patrick Flynn, Director of Safety, United States Of America
Seizing Digital Opportunities to Increase Project Control in Natural Resources Projects

Seizing Digital Opportunities to Increase Project Control in Natural Resources Projects

Eric Wilson, Vice President, Turner and Townsend

An Effective Approach to Safety Technology

Shaun Carvalho, Chief Safety Officer, Shawmut Design and Construction
An Effective Approach to Safety Technology

The Ground is Shifting the Changing Privacy and Regulatory Landscape

Richard Mendoza, Senior Director, Data Privacy & Regulatory Compliance, Realogy
The Ground is Shifting  the Changing Privacy and Regulatory Landscape
Loading...

Copyright © 2022 Construction Business Review . All rights reserved. |  Subscribe follow on linkedin

This content is copyright protected

However, if you would like to share the information in this article, you may use the link below:

https://underground-construction-solutions.constructionbusinessreview.com/cxoinsight/accelerated-bridge-construction-techniques-using-prefabricated-and-preassembled-structural-systems-nwid-198.html